Every shipment be asked to reached the Tianjin port before 4-5days the ETD(estimated time of departure) of the vessel. So in general, the supplier need to arrange for the shipment before 7-9days the ETD of the vessel. All the labels and packing must be completely finished before the 8-10days the ETD of the vessel.If not, the vessel only to be delayed.